The pergola can either be attached to the house or constructed as a free standing entity.
Build pergola on concrete slab.
And if installing buried in a concrete footer then you will need to add the length of the post below the ground to the desired height of the posts.
Start by establishing a chalk line for one of the edges of your posts.
The builder uses 2 6 feet redwood lumber and his pergola design has a wooden deck attached to the concrete slab.
I chose the front edge for convenience and because prior measurements showed that the concrete slab didn t have entirely square sides.
Got quotes from lumber y.
All lumber was outdoor pressure treated.
This line will be the basis for your measurements from here on in.
Many people install their pergola or pavilion kit on a pre existing wooden deck.
Build a vine covered pergola in your backyard to shade a stone patio or wood deck using wood beams and lattice set on precast classical style columns.
How tall do you want your pergola.
Since the patio was in good solid shape with concrete 5 to 6 thick we took the instant gratification route and built it right on the patio.
In either case you will need to anchor the posts onto concrete.
Normally a free standing pergola would be built on concrete piers sunk below the frost line.
The post skirt that comes with your kit will then cover that area for a seamless look.
The redwood backyard plan.
Post installation method whether you are installing either buried in a concrete footer or installed on top of a concrete footer or existing concrete slab.
Next pick one side to start marking a line perpendicular to your first line.
Trying to set the posts onto the concrete without any type of anchor will result in it being knocked over in the event of strong winds.
He also shows you how to install grass around the pergola with an irrigation system in place.
The dappled sunlight created by the overhead latticework creates a cool relaxing environment perfect for backyard entertaining like standing in the shade of a tree on a hot summer day.
The paver or flagstone can then be layered on top.
The posts need to be set on a footer or directly on a concrete pad.